Showing posts with label Generic Budd RDC3... NH and B&M variants in the works. Show all posts
Showing posts with label Generic Budd RDC3... NH and B&M variants in the works. Show all posts

Nov 29, 2013

Windsor Locks Station

A local passenger just arrived. For some reason the train pulled in on the wrong track. Northbound trains usually stop on track 2 and passengers have to cross over track 1 and access the train via the narrow wooden platform between the tracks. (Of course nearby southbound traffic gets stopped during such a station stop.)


I wonder what these two are talking about? 

All aboard! Next stop is Thompsonville.





Nov 28, 2013

Heayvweight

More rolling stock for the upcoming version 1.0: a heavyweight coach. Still work in progress, but almost done.


Nov 16, 2013

You say potato?

I say newsprint!

Here's a quick preview of one more freight car that will be part of the upcoming version 1.0 of the VNHRR Springfield route: the iconic State of Maine potato reefer. Those cars were also used to haul clean cargo, typically newsprint, instead of standing around unused waiting for the next harvest season.



Oct 12, 2013

Trailiner in Springfield

Some screenshots of our new Trailiner equipment (New Haven's pioneering TOFC service) in downtown Springfield, and a picture of our new Boston & Maine caboose in the Minuteman paint scheme.






Sep 4, 2013

More Rolling Stock for 1.0

A preview of one of the new rolling stock items that will ship with version 1.0, a TOFC car, loaded with AeroVan trailers built by Thomas Pearce of Broadway Limited Locomotive Works.


 

Aug 1, 2013

First Version is Available


The first version of the VNHRR has just been released on our website:
http://vnhrr.golden-age-rails.com/index.html



ImageIn order to not keep you waiting any longer, we have decided to publish a pre-release version of the first phase of the VNHRR. It includes the complete route of version 1.0 (Springfield to Windsor Locks and the Suffield Branch), but an incomplete selection of rolling stock and scenarios. This pre-release version is being offered at a 20% discount over the regular retail price of version 1.0 ($19.99 instead of $24.99).

For more information, details and screenshots please visit the new VNHRR website:
http://vnhrr.golden-age-rails.com/details.html

Jul 31, 2013

New VNHRR Website; First Release Almost Ready

We have launched a new website for the Virtual New Haven Railroad.

On this website you can find a wealth of information about the route, lots of new screenshots, download the manuals for the route... and soon will be able to buy it too, at a special Version 0.9 Pre-Release Discount!

Jul 26, 2013

The next pre-release milestone

The VNHRR Springfield Line is now Quick Drive ready, with AI traffic and static consists that spawn at random.


Jul 8, 2013

Edging closer to the release

We're not done yet with our work on the route, but here is something that we didn't want to have to do last minute: creating the documentation! At this point we already have a fourteen page manual, a two page signal chart and a three page scenario guide, which will grow even larger before the release.


Jul 1, 2013

Switching at Windsor Locks, CT

A single RS-3 has just brought in seven loaded boxcars from Bradley Field airport and is now switching cars at the small yard in Windsor Locks.


Jun 30, 2013

Hacks

The Virtual New Haven RR got their first cabooses... NE-5 class cabooses, to be precise.


Jun 18, 2013

Feeling Blue?

The B&M and NH interchanged a lot of cars at Springfield, so naturally we needed some B&M cars on our route.


Jun 9, 2013

First Scenario Test

Some screenshots from our first scenario test, "Winter Coal Deliveries".
Still got some way to go, but we're getting closer and closer to our first release.






Jun 5, 2013

Rolling Stock

It's been a while since our last post, but we return with some good news: our rolling stock pack is taking shape nicely! We now have two new engines on our route, an ALCO FA/B-1 built by Mannu Pach and an ALCO RS-3 built by Dick Cowen, and our freight car roster is growing too. Only a caboose is still missing, then we can begin writing scenarios.








Mar 21, 2013

Version 1 Scenery Work Complete

After more than two years of development, we have now completed the scenery work on version 1 of the Virtual New Haven route. Now it's on to testing, bug fixing, and finally work on the rolling stock pack and scenarios. So it'll be a little while longer until version 1 is fully complete, but the end is finally in sight.

Our plan for version 2 is to extend the route to Hartford, CT. While this is only a few more miles from the version 1 terminus at Windsor Locks, the complex track layout and urban setting around Hartford will make this a major undertaking.

Below are some more screenshots of the latest scenery developments in Springfield, MA.